PROPERTIES FOR SALE

90 W Jeanne Saeger Park Shelton, WA 98584

This aerial really captures the incredible sense of permanence & privacy this property offers b/c tucked into the surrounding forest & anchored directly into bedrock, this home was built w/serious long-term intention. The foundation itself was additionally reinforced & pinned directly into the rock below, creating exceptional structural stability on an already incredibly solid site, which honestly feels very on-brand for a property that approaches everything with a little extra “overbuild it & sleep peacefully forever” energy. Surrounding the homesite you can see the beautiful wooded acreage stretching outward in every direction creating that rare sense of total separation & quiet while still keeping the property practical & accessible. Both the home & the massive shop feature durable metal roofing adding long-term beauty, low-maintenance performance & that satisfying “this place was built to last” feeling throughout the entire compound. There is also a propane tank for future projects
This aerial really captures the incredible sense of permanence & privacy this property offers b/c tucked into the surrounding forest & anchored directly into bedrock, this home was built w/serious long-term intention. The foundation itself was additionally reinforced & pinned directly into the rock below, creating exceptional structural stability on an already incredibly solid site, which honestly feels very on-brand for a property that approaches everything with a little extra “overbuild it & sleep peacefully forever” energy. Surrounding the homesite you can see the beautiful wooded acreage stretching outward in every direction creating that rare sense of total separation & quiet while still keeping the property practical & accessible. Both the home & the massive shop feature durable metal roofing adding long-term beauty, low-maintenance performance & that satisfying “this place was built to last” feeling throughout the entire compound. There is also a propane tank for future projects
Imagine waking up to THIS every single morning. The soft sunrise glow hitting Mount Rainier in the distance while the surrounding treetops slowly light up below feels less like ordinary homeownership and more like somebody accidentally gave you access to a luxury mountain retreat that never closes. The beauty of this property is that while it feels wonderfully private and tucked away atop 20 acres of peaceful forested land, you are still only about 10 minutes from downtown Shelton where you will find everyday conveniences like Safeway, Walmart Supercenter, local dining spots, coffee shops and services close at hand. You are also near Isabella Lake State Park for even more outdoor recreation opportunities, and when city errands or commuting call, Olympia sits only about 30 minutes away.
Imagine waking up to THIS every single morning. The soft sunrise glow hitting Mount Rainier in the distance while the surrounding treetops slowly light up below feels less like ordinary homeownership and more like somebody accidentally gave you access to a luxury mountain retreat that never closes. The beauty of this property is that while it feels wonderfully private and tucked away atop 20 acres of peaceful forested land, you are still only about 10 minutes from downtown Shelton where you will find everyday conveniences like Safeway, Walmart Supercenter, local dining spots, coffee shops and services close at hand. You are also near Isabella Lake State Park for even more outdoor recreation opportunities, and when city errands or commuting call, Olympia sits only about 30 minutes away.
Standing at the top of the staircase, the scale of this home and the sheer magnitude of the views really hits you all at once because the massive vaulted showcase windows completely frame the Olympic Mountain range and surrounding territorial views like living artwork changing by the hour. This is not some tiny peekaboo mountain glimpse you have to lean sideways to find between rooftops either, this is full dramatic Pacific Northwest scenery on display from one of the best vantage points in the entire house. From up here you can also really appreciate how the soaring ceilings, wood-plank details and open sightlines all work together to create a true lodge-style atmosphere while still feeling bright and welcoming instead of dark or heavy, and just below, the glass door beside the fireplace leads directly out to the massive deck where stairs continue down toward the hot tub area.
Standing at the top of the staircase, the scale of this home and the sheer magnitude of the views really hits you all at once because the massive vaulted showcase windows completely frame the Olympic Mountain range and surrounding territorial views like living artwork changing by the hour. This is not some tiny peekaboo mountain glimpse you have to lean sideways to find between rooftops either, this is full dramatic Pacific Northwest scenery on display from one of the best vantage points in the entire house. From up here you can also really appreciate how the soaring ceilings, wood-plank details and open sightlines all work together to create a true lodge-style atmosphere while still feeling bright and welcoming instead of dark or heavy, and just below, the glass door beside the fireplace leads directly out to the massive deck where stairs continue down toward the hot tub area.
From above, you really start appreciating just how extensively this property was planned because everything has its place while still keeping the home itself positioned front and center for the absolute best views and overall living experience. The oversized 3,000-square-foot shop dominates the center of the property and is actually larger than the house, creating a dream setup for hobbyists, collectors or anyone whose lifestyle requires serious storage and workspace capacity. Off to the right sits the covered RV parking area complete with hookups and gazebo-style deck space, while behind the shop are TWO additional adjustable-height carports ideal for trailers, campers, boats, RVs or extra vehicle coverage depending on future needs. There is even an additional garden shed tucked to the side for even more practical storage. What works so well here though is that all of these utility & recreational structures are intentionally placed behind the home, preserving those jaw-dropping views.
From above, you really start appreciating just how extensively this property was planned because everything has its place while still keeping the home itself positioned front and center for the absolute best views and overall living experience. The oversized 3,000-square-foot shop dominates the center of the property and is actually larger than the house, creating a dream setup for hobbyists, collectors or anyone whose lifestyle requires serious storage and workspace capacity. Off to the right sits the covered RV parking area complete with hookups and gazebo-style deck space, while behind the shop are TWO additional adjustable-height carports ideal for trailers, campers, boats, RVs or extra vehicle coverage depending on future needs. There is even an additional garden shed tucked to the side for even more practical storage. What works so well here though is that all of these utility & recreational structures are intentionally placed behind the home, preserving those jaw-dropping views.
One of the underrated luxuries of this property is how incredibly easy and welcoming the arrival experience feels because unlike some rural mountain homes where guests need a map, a flashlight and emotional support to figure out where to park, this setup is wonderfully open, accessible and practical. The large gravel parking area offers abundant room for friends, family, recreational vehicles and easy turnaround space while the blooming planters add just enough softness and color to keep the approach feeling warm and inviting instead of overly utilitarian. The extra-wide staircase leading up toward the massive deck and main living areas also makes the transition to the home feel substantial and welcoming, and from this angle you can really appreciate how thoughtfully the property balances rugged mountain privacy with comfortable everyday usability.
One of the underrated luxuries of this property is how incredibly easy and welcoming the arrival experience feels because unlike some rural mountain homes where guests need a map, a flashlight and emotional support to figure out where to park, this setup is wonderfully open, accessible and practical. The large gravel parking area offers abundant room for friends, family, recreational vehicles and easy turnaround space while the blooming planters add just enough softness and color to keep the approach feeling warm and inviting instead of overly utilitarian. The extra-wide staircase leading up toward the massive deck and main living areas also makes the transition to the home feel substantial and welcoming, and from this angle you can really appreciate how thoughtfully the property balances rugged mountain privacy with comfortable everyday usability.
This shop is absolutely outrageous in the best possible way. At 3,000 square feet and FOUR full bays, it is actually larger than the house itself, which honestly tells you a lot about the personality of this property before you even step inside. Built with metal siding and a metal roof for durability and low maintenance, the space is set up to accommodate up to 12 vehicles and includes THREE automotive lifts that remain with the property, creating an absolute dream setup for collectors, mechanics, hobbyists or anyone whose current garage situation consists mostly of creative frustration and strategic parking negotiations. The scale here is seriously impressive, and the upstairs unfinished apartment and additional bonus room space accessed by the staircase adds even more flexibility for future expansion, guest accommodations, workspaces or recreational use. This is not “extra garage space.” This is full-blown lifestyle infrastructure.
This shop is absolutely outrageous in the best possible way. At 3,000 square feet and FOUR full bays, it is actually larger than the house itself, which honestly tells you a lot about the personality of this property before you even step inside. Built with metal siding and a metal roof for durability and low maintenance, the space is set up to accommodate up to 12 vehicles and includes THREE automotive lifts that remain with the property, creating an absolute dream setup for collectors, mechanics, hobbyists or anyone whose current garage situation consists mostly of creative frustration and strategic parking negotiations. The scale here is seriously impressive, and the upstairs unfinished apartment and additional bonus room space accessed by the staircase adds even more flexibility for future expansion, guest accommodations, workspaces or recreational use. This is not “extra garage space.” This is full-blown lifestyle infrastructure.
This unfinished apartment above the shop has the kind of upside potential that gets buyers immediately spinning out into future plans before they have even left the property. The vaulted ceilings give the space a surprisingly open & inviting feel, & much of the foundational work has already been started including THREE separate mini-split systems for heating & air conditioning plus a kitchenette setup featuring white shaker cabinetry. The refrigerator & microwave remain w/the property as well, creating a fantastic starting point for finishing the space into guest quarters, a private office retreat, creative studio, caretaker setup or add'l living area depending on future needs. What makes it especially appealing is how separate it feels from the main home while still sitting fully integrated into the overall compound-style layout of the property. This is the kind of flexible bonus space that becomes more valuable the longer you own it b/c life inevitably invents uses for it over time.
This unfinished apartment above the shop has the kind of upside potential that gets buyers immediately spinning out into future plans before they have even left the property. The vaulted ceilings give the space a surprisingly open & inviting feel, & much of the foundational work has already been started including THREE separate mini-split systems for heating & air conditioning plus a kitchenette setup featuring white shaker cabinetry. The refrigerator & microwave remain w/the property as well, creating a fantastic starting point for finishing the space into guest quarters, a private office retreat, creative studio, caretaker setup or add'l living area depending on future needs. What makes it especially appealing is how separate it feels from the main home while still sitting fully integrated into the overall compound-style layout of the property. This is the kind of flexible bonus space that becomes more valuable the longer you own it b/c life inevitably invents uses for it over time.
The sunrise views from this property genuinely feel cinematic, especially as the first light starts spilling across the Olympic Mountains and surrounding forests below. It is the kind of scenery that changes constantly depending on weather and season, yet somehow never stops feeling dramatic or calming at the exact same time. Reaching the property itself adds to that retreat-like experience too because the long private driveway winds gradually through the acreage before opening up to the homesite at the top of the mountain, creating a wonderful sense of arrival and separation from the outside world. There is a small easement located only at the final bend in the driveway for access beyond, while the vast majority of the driveway belongs entirely to this 20.1-acre parcel. Power and the well infrastructure are located lower on the property near the base of the drive, while the home itself sits elevated above it all surrounded by privacy, forest and endless Pacific Northwest scenery.
The sunrise views from this property genuinely feel cinematic, especially as the first light starts spilling across the Olympic Mountains and surrounding forests below. It is the kind of scenery that changes constantly depending on weather and season, yet somehow never stops feeling dramatic or calming at the exact same time. Reaching the property itself adds to that retreat-like experience too because the long private driveway winds gradually through the acreage before opening up to the homesite at the top of the mountain, creating a wonderful sense of arrival and separation from the outside world. There is a small easement located only at the final bend in the driveway for access beyond, while the vast majority of the driveway belongs entirely to this 20.1-acre parcel. Power and the well infrastructure are located lower on the property near the base of the drive, while the home itself sits elevated above it all surrounded by privacy, forest and endless Pacific Northwest scenery.
This angle gives such a great overview of how beautifully the outdoor living spaces connect together because you can clearly see the relationship between the massive deck, hot tub pad and the main living areas of the home. The sliding glass door to the right leads directly into the primary suite while the slider to the left connects to the dining room, creating effortless indoor-outdoor flow throughout the entire main level and making the nearly 1,000-square-foot deck feel like a true extension of the house itself instead of just an added platform outside. You can also really appreciate the peaceful spacing and natural landscaping surrounding the home from this perspective, including fruit trees and blueberry bushes tucked between the house and shop adding even more charm and functionality to the acreage lifestyle. Sprinklers installed around the exterior help keep the grounds maintained more easily, and beneath the home there is also a tall accessible crawlspace providing storage.
This angle gives such a great overview of how beautifully the outdoor living spaces connect together because you can clearly see the relationship between the massive deck, hot tub pad and the main living areas of the home. The sliding glass door to the right leads directly into the primary suite while the slider to the left connects to the dining room, creating effortless indoor-outdoor flow throughout the entire main level and making the nearly 1,000-square-foot deck feel like a true extension of the house itself instead of just an added platform outside. You can also really appreciate the peaceful spacing and natural landscaping surrounding the home from this perspective, including fruit trees and blueberry bushes tucked between the house and shop adding even more charm and functionality to the acreage lifestyle. Sprinklers installed around the exterior help keep the grounds maintained more easily, and beneath the home there is also a tall accessible crawlspace providing storage.
This is one of those layouts that gets the balance exactly right b/c the living room absolutely feels like its own room w/a true focal point, strong architectural definition & enough separation from the dining space to create different moods & gathering zones, yet everything still flows together naturally w/o feeling compartmentalized.  The soaring ceilings, massive windows & heated slate flooring tie the spaces together visually while the partial wall divisions & thoughtful layout keep each area feeling intentional & grounded. Honestly the amount of access this home gives you to the outdoor living spaces is almost comical in the best way possible b/c there are FOUR separate doors b/w the living & dining rooms leading directly onto the 957-square-foot wraparound deck, meaning the Olympic Mt. views are never more than a few steps away no matter where you are standing. This house was very clearly designed around the scenery & understands PNW beauty.
This is one of those layouts that gets the balance exactly right b/c the living room absolutely feels like its own room w/a true focal point, strong architectural definition & enough separation from the dining space to create different moods & gathering zones, yet everything still flows together naturally w/o feeling compartmentalized. The soaring ceilings, massive windows & heated slate flooring tie the spaces together visually while the partial wall divisions & thoughtful layout keep each area feeling intentional & grounded. Honestly the amount of access this home gives you to the outdoor living spaces is almost comical in the best way possible b/c there are FOUR separate doors b/w the living & dining rooms leading directly onto the 957-square-foot wraparound deck, meaning the Olympic Mt. views are never more than a few steps away no matter where you are standing. This house was very clearly designed around the scenery & understands PNW beauty.
This view of Mount Rainier feels almost surreal w/the snow-capped peak rising through layers of mist & clouds while towering evergreens frame the landscape like something straight out of a Pacific Northwest tourism campaign that accidentally became your actual backyard. And honestly, this scenery says a lot about the character of Shelton itself because this entire area was built around the surrounding forests, logging industry and deep connection to nature that still defines the culture here today. Shelton has long been known for its timber history & also earned the nickname “Christmas Town USA” thanks to the region’s extensive Christmas tree cultivation, which feels very believable once you see just how endlessly green and forested everything surrounding this property truly is. At the same time, the nearby waterways and oyster cultivation industries helped shape the area’s maritime roots as well, creating this fascinating blend of rugged independence, outdoor lifestyle & PNW Heritage.
This view of Mount Rainier feels almost surreal w/the snow-capped peak rising through layers of mist & clouds while towering evergreens frame the landscape like something straight out of a Pacific Northwest tourism campaign that accidentally became your actual backyard. And honestly, this scenery says a lot about the character of Shelton itself because this entire area was built around the surrounding forests, logging industry and deep connection to nature that still defines the culture here today. Shelton has long been known for its timber history & also earned the nickname “Christmas Town USA” thanks to the region’s extensive Christmas tree cultivation, which feels very believable once you see just how endlessly green and forested everything surrounding this property truly is. At the same time, the nearby waterways and oyster cultivation industries helped shape the area’s maritime roots as well, creating this fascinating blend of rugged independence, outdoor lifestyle & PNW Heritage.
This is the room people will remember long after they leave the property. The massive 2-story vaulted great room feels almost cinematic w/its soaring wood-plank ceilings & towering showcase windows stretching across the entire wall, framing breathtaking Olympic Mts views like living artwork. Somebody designing this home clearly understood exactly what they were doing b/c the operable sections of the lower windows were thoughtfully positioned down at the base, allowing uninterrupted sightlines instead of chopping up the scenery w/bulky framing right at eye level. The result is an incredible full-sweep mt view that completely commands the room. A handsome stacked-stone fireplace w/gas insert grounds the space w/warmth & texture while the mounted TV remains w/the home & integrated speaker systems run throughout both the interior & exterior spaces w/individual rm controls for easy entertaining. Another glass door w/transom window above leads directly onto the huge 957-sf deck outside.
This is the room people will remember long after they leave the property. The massive 2-story vaulted great room feels almost cinematic w/its soaring wood-plank ceilings & towering showcase windows stretching across the entire wall, framing breathtaking Olympic Mts views like living artwork. Somebody designing this home clearly understood exactly what they were doing b/c the operable sections of the lower windows were thoughtfully positioned down at the base, allowing uninterrupted sightlines instead of chopping up the scenery w/bulky framing right at eye level. The result is an incredible full-sweep mt view that completely commands the room. A handsome stacked-stone fireplace w/gas insert grounds the space w/warmth & texture while the mounted TV remains w/the home & integrated speaker systems run throughout both the interior & exterior spaces w/individual rm controls for easy entertaining. Another glass door w/transom window above leads directly onto the huge 957-sf deck outside.
The flow between the dining room and great room is incredibly well balanced here because the spaces feel connected and open without losing their own identity, which honestly is harder to pull off than most builders realize. A thoughtfully placed partial wall creates just enough architectural separation to define the dining area while still allowing natural light, fireplace views and conversation to carry freely throughout the entire main level. From the dining room you can look directly toward the great room, catch the warmth of the fireplace to the side and still stay fully connected to everything happening around you, making the whole layout feel social, relaxed and wonderfully livable. Heated slate floors continue seamlessly throughout the spaces bringing in all that gorgeous earthy movement and texture, while the sliding glass doors opening to the wraparound deck flood the room with natural light and pull the Olympic Mountain setting right into the heart of the home.
The flow between the dining room and great room is incredibly well balanced here because the spaces feel connected and open without losing their own identity, which honestly is harder to pull off than most builders realize. A thoughtfully placed partial wall creates just enough architectural separation to define the dining area while still allowing natural light, fireplace views and conversation to carry freely throughout the entire main level. From the dining room you can look directly toward the great room, catch the warmth of the fireplace to the side and still stay fully connected to everything happening around you, making the whole layout feel social, relaxed and wonderfully livable. Heated slate floors continue seamlessly throughout the spaces bringing in all that gorgeous earthy movement and texture, while the sliding glass doors opening to the wraparound deck flood the room with natural light and pull the Olympic Mountain setting right into the heart of the home.
This deck is an absolute showpiece! Spanning nearly 1,000 square feet, the massive solid wood deck stretches across the home soaking in breathtaking northeast-facing views of the Olympic Mountain range along with stunning glimpses of Mount Rainier rising in the distance. There is room out here for everything, oversized dining setups, outdoor lounging, gatherings, quiet mornings, late-night stargazing or simply sitting in complete silence while nature aggressively heals your nervous system. The deck and railings were also recently reinforced adding even more confidence and longevity to this already incredible outdoor living space. And because the home sits atop more than 20 acres of private land, the scenery and peacefulness here feel remarkably protected and secluded, creating that rare sense of true retreat while still remaining connected to modern conveniences below the mountain.
This deck is an absolute showpiece! Spanning nearly 1,000 square feet, the massive solid wood deck stretches across the home soaking in breathtaking northeast-facing views of the Olympic Mountain range along with stunning glimpses of Mount Rainier rising in the distance. There is room out here for everything, oversized dining setups, outdoor lounging, gatherings, quiet mornings, late-night stargazing or simply sitting in complete silence while nature aggressively heals your nervous system. The deck and railings were also recently reinforced adding even more confidence and longevity to this already incredible outdoor living space. And because the home sits atop more than 20 acres of private land, the scenery and peacefulness here feel remarkably protected and secluded, creating that rare sense of true retreat while still remaining connected to modern conveniences below the mountain.
If you are going to live on top of a mountain surrounded by 20 acres, this is exactly how the dining room should behave. Walls of glass, multiple deck access points and sweeping Olympic Mountain views make the entire space feel open and expansive, while the heated slate flooring anchors everything with rich natural texture and color variation pulled straight from the Pacific Northwest landscape itself. The slate is stunning too, full of smoky grays, earthy browns, mossy greens and warm amber tones that give the room depth, warmth and a little bit of rugged elegance without becoming overly formal or precious. Bright white ceilings keep the room feeling airy overhead, recessed lighting adds clean modern function and the clustered drop-pendant chandelier over the dining table gives just enough contemporary sparkle to elevate the whole vibe.
If you are going to live on top of a mountain surrounded by 20 acres, this is exactly how the dining room should behave. Walls of glass, multiple deck access points and sweeping Olympic Mountain views make the entire space feel open and expansive, while the heated slate flooring anchors everything with rich natural texture and color variation pulled straight from the Pacific Northwest landscape itself. The slate is stunning too, full of smoky grays, earthy browns, mossy greens and warm amber tones that give the room depth, warmth and a little bit of rugged elegance without becoming overly formal or precious. Bright white ceilings keep the room feeling airy overhead, recessed lighting adds clean modern function and the clustered drop-pendant chandelier over the dining table gives just enough contemporary sparkle to elevate the whole vibe.
The kitchen carries that same rich chalet lodge-inspired warmth flowing throughout the rest of the main floor, only here it gets layered with a little more function and gathering energy. Heated slate floors continue throughout with all the beautiful natural movement and color variation that make the entire house feel connected to the surrounding landscape, while the warm shaker cabinetry and granite counters keep everything feeling substantial, grounded and wonderfully inviting. The peninsula seating creates the perfect casual landing spot for coffee, wine, snacks or supervising whoever got assigned dinner duty, and sitting right beside the glass door leading to the wraparound deck means this kitchen naturally spills outdoors during gatherings and summer evenings. The granite backsplash running all the way to the bottom of the upper cabinetry gives the room a more finished custom feel too, while the black appliance suite ties effortlessly into the darker slate tones and mountain-home p
The kitchen carries that same rich chalet lodge-inspired warmth flowing throughout the rest of the main floor, only here it gets layered with a little more function and gathering energy. Heated slate floors continue throughout with all the beautiful natural movement and color variation that make the entire house feel connected to the surrounding landscape, while the warm shaker cabinetry and granite counters keep everything feeling substantial, grounded and wonderfully inviting. The peninsula seating creates the perfect casual landing spot for coffee, wine, snacks or supervising whoever got assigned dinner duty, and sitting right beside the glass door leading to the wraparound deck means this kitchen naturally spills outdoors during gatherings and summer evenings. The granite backsplash running all the way to the bottom of the upper cabinetry gives the room a more finished custom feel too, while the black appliance suite ties effortlessly into the darker slate tones and mountain-home p
There is something deeply satisfying about a kitchen that feels both beautiful AND wildly functional, and this one absolutely pulls that off. Between the dual sink setup, expansive granite counters and multiple cooking zones, the entire space feels designed to support real entertaining instead of just looking pretty in photos. One sink serves as a prep station with a more commercial-style faucet and integrated rack system, while the large undermount sink sits in front of the oversized window where you can soak in mountain views while white granite counters brighten the entire kitchen and provide tons of workspace. Undercabinet lighting adds warmth and depth against the shaker cabinetry and natural slate flooring below and the black appliance suite ties beautifully into the darker slate tones. The electric range setup offers extra ease and peace of mind during busy cooking sessions without worrying about open gas burners getting bumped mid-chaos, plus the additional built-in wall oven m
There is something deeply satisfying about a kitchen that feels both beautiful AND wildly functional, and this one absolutely pulls that off. Between the dual sink setup, expansive granite counters and multiple cooking zones, the entire space feels designed to support real entertaining instead of just looking pretty in photos. One sink serves as a prep station with a more commercial-style faucet and integrated rack system, while the large undermount sink sits in front of the oversized window where you can soak in mountain views while white granite counters brighten the entire kitchen and provide tons of workspace. Undercabinet lighting adds warmth and depth against the shaker cabinetry and natural slate flooring below and the black appliance suite ties beautifully into the darker slate tones. The electric range setup offers extra ease and peace of mind during busy cooking sessions without worrying about open gas burners getting bumped mid-chaos, plus the additional built-in wall oven m
Looking from the kitchen back toward the dining and great room, you really start appreciating how thoughtfully this home was designed to keep every major living space connected without losing definition or warmth. The kitchen feels open and social while still giving you plenty of functional storage tucked beautifully into the custom cabinetry layout, including a large upper bank of cabinetry surrounding the fridge and second oven that keeps everything feeling polished and built-in instead of pieced together over time. The included French-door refrigerator with bottom freezer and water dispenser blends seamlessly into the space, while the oversized deep drawer cabinetry beneath the wall oven is the kind of feature people become irrationally passionate about once they have lived with it. Wide pullout drawers make pots, pans and oversized kitchen gear incredibly accessible while still maintaining the rich warm wood cabinetry aesthetic throughout the room.
Looking from the kitchen back toward the dining and great room, you really start appreciating how thoughtfully this home was designed to keep every major living space connected without losing definition or warmth. The kitchen feels open and social while still giving you plenty of functional storage tucked beautifully into the custom cabinetry layout, including a large upper bank of cabinetry surrounding the fridge and second oven that keeps everything feeling polished and built-in instead of pieced together over time. The included French-door refrigerator with bottom freezer and water dispenser blends seamlessly into the space, while the oversized deep drawer cabinetry beneath the wall oven is the kind of feature people become irrationally passionate about once they have lived with it. Wide pullout drawers make pots, pans and oversized kitchen gear incredibly accessible while still maintaining the rich warm wood cabinetry aesthetic throughout the room.
One of the things this home does exceptionally well is create separation w/o sacrificing openness & this view captures that perfectly. From the kitchen you can see how the layout naturally flows toward the foyer, laundry room & staircase while still keeping the kitchen itself slightly removed from the immediate entry area so if you choose, guests are welcomed into the home instead of directly into your grocery bags & countertop chaos. The hallway connection to the laundry room makes daily life incredibly practical too, especially on acreage living days where muddy shoes, gardening clothes & mountain life tend to make regular appearances. The staircase itself adds so much architectural warmth w/solid pine stair treads, iron-style balusters & a substantial wood handrail that all feel perfectly suited to the elevated lodge-inspired vibe of the home, while the heated slate flooring continuing throughout the main level ties everything together beautifully w/rich natural texture & warmth.
One of the things this home does exceptionally well is create separation w/o sacrificing openness & this view captures that perfectly. From the kitchen you can see how the layout naturally flows toward the foyer, laundry room & staircase while still keeping the kitchen itself slightly removed from the immediate entry area so if you choose, guests are welcomed into the home instead of directly into your grocery bags & countertop chaos. The hallway connection to the laundry room makes daily life incredibly practical too, especially on acreage living days where muddy shoes, gardening clothes & mountain life tend to make regular appearances. The staircase itself adds so much architectural warmth w/solid pine stair treads, iron-style balusters & a substantial wood handrail that all feel perfectly suited to the elevated lodge-inspired vibe of the home, while the heated slate flooring continuing throughout the main level ties everything together beautifully w/rich natural texture & warmth.
Now THIS is a shower. The oversized glass walk-in design feels straight out of a luxury mountain lodge spa with enough room for two, dual shower systems and all the little thoughtful details that make the entire experience feel elevated instead of purely functional. Underfoot, the polished river rock flooring adds incredible texture and warmth while still feeling smooth and comfortable, and the tile walls are finished with decorative accent detailing that keeps the entire space visually interesting without becoming busy or trendy. Each shower station includes its own rain-style fixture and body sprays turning regular showers into something significantly more dramatic than they technically need to be, which honestly feels appropriate for this property. Built-in shelving keeps products neatly tucked away, a footrest makes shaving or rinsing easier and the long horizontal privacy window above allows fresh mountain air to flow through the space while still maintaining complete privacy.
Now THIS is a shower. The oversized glass walk-in design feels straight out of a luxury mountain lodge spa with enough room for two, dual shower systems and all the little thoughtful details that make the entire experience feel elevated instead of purely functional. Underfoot, the polished river rock flooring adds incredible texture and warmth while still feeling smooth and comfortable, and the tile walls are finished with decorative accent detailing that keeps the entire space visually interesting without becoming busy or trendy. Each shower station includes its own rain-style fixture and body sprays turning regular showers into something significantly more dramatic than they technically need to be, which honestly feels appropriate for this property. Built-in shelving keeps products neatly tucked away, a footrest makes shaving or rinsing easier and the long horizontal privacy window above allows fresh mountain air to flow through the space while still maintaining complete privacy.
The placement of this powder room is honestly incredibly smart because it sits right off the foyer where guests can freshen up immediately upon arriving without wandering through the private areas of the home. It also works beautifully for everyday life since it is positioned perfectly for those last-minute mirror checks and quick touch-ups before heading out the door. The space itself feels far more elevated than a typical basic powder room thanks to the extra-long countertop, oversized undermount sink and warm shaker-style vanity cabinetry that continues the same rich material palette carried throughout the house.
The placement of this powder room is honestly incredibly smart because it sits right off the foyer where guests can freshen up immediately upon arriving without wandering through the private areas of the home. It also works beautifully for everyday life since it is positioned perfectly for those last-minute mirror checks and quick touch-ups before heading out the door. The space itself feels far more elevated than a typical basic powder room thanks to the extra-long countertop, oversized undermount sink and warm shaker-style vanity cabinetry that continues the same rich material palette carried throughout the house.
The primary suite keeps the same grounded mountain-chalet warmth flowing throughout the rest of the home while dialing up the retreat energy in all the right ways. Heated slate floors continue into the space bringing all that gorgeous natural texture and warmth underfoot, while the soft cream-toned walls and recessed lighting keep the room feeling calm, cozy and wonderfully connected to the rest of the home’s design story. A sliding glass door opens directly onto the massive 957-square-foot wraparound deck where a set of exterior stairs leads down toward the hot tub below, which honestly feels like the exact kind of setup you want after a cold winter evening or long day outside on the property. A second large window continues pulling in natural light and surrounding territorial views, and the overall atmosphere of the room feels peaceful and private without losing the dramatic mountain-home character carried throughout the rest of the house.
The primary suite keeps the same grounded mountain-chalet warmth flowing throughout the rest of the home while dialing up the retreat energy in all the right ways. Heated slate floors continue into the space bringing all that gorgeous natural texture and warmth underfoot, while the soft cream-toned walls and recessed lighting keep the room feeling calm, cozy and wonderfully connected to the rest of the home’s design story. A sliding glass door opens directly onto the massive 957-square-foot wraparound deck where a set of exterior stairs leads down toward the hot tub below, which honestly feels like the exact kind of setup you want after a cold winter evening or long day outside on the property. A second large window continues pulling in natural light and surrounding territorial views, and the overall atmosphere of the room feels peaceful and private without losing the dramatic mountain-home character carried throughout the rest of the house.
From this western-facing perspective, you really start appreciating how thoughtfully positioned this home is within the landscape because the soaring pine trees surrounding the property create incredible privacy and that immersive forested mountain atmosphere people crave, while still sitting far enough from the home itself to avoid feeling crowded or concerning during heavy wind and storm seasons. Perched high above the surrounding terrain, the property also becomes a fantastic place to take in local wildlife with bald eagles frequently visible overhead along with all the quiet natural beauty that comes from living atop 20 private acres. Structurally, this home was also built with serious intention because the already bedrock-based site was further reinforced by pinning the foundation directly into the rock itself, creating remarkable stability & durability beneath the home. Combined w/the fire-resistant HardiePlank siding & metal roofing system outside, the property carries strength.
From this western-facing perspective, you really start appreciating how thoughtfully positioned this home is within the landscape because the soaring pine trees surrounding the property create incredible privacy and that immersive forested mountain atmosphere people crave, while still sitting far enough from the home itself to avoid feeling crowded or concerning during heavy wind and storm seasons. Perched high above the surrounding terrain, the property also becomes a fantastic place to take in local wildlife with bald eagles frequently visible overhead along with all the quiet natural beauty that comes from living atop 20 private acres. Structurally, this home was also built with serious intention because the already bedrock-based site was further reinforced by pinning the foundation directly into the rock itself, creating remarkable stability & durability beneath the home. Combined w/the fire-resistant HardiePlank siding & metal roofing system outside, the property carries strength.
This dedicated hot tub area adds another layer of retreat-style living to the property because the setting out here feels incredibly peaceful and private surrounded by towering trees, territorial views and the quiet natural atmosphere that comes with living atop 20 acres. The concrete pad already includes the necessary hookups for a hot tub setup, and while the current hot tub included with the property needs some repair, it also comes with the cover and convenient access steps that can easily work with a future upgraded unit if desired. The location itself is honestly fantastic because you still capture the same beautiful natural scenery and expansive outlooks found throughout the rest of the property while feeling tucked into your own little forest spa hideaway at the same time. This is exactly the kind of spot that turns into everyone’s favorite place on the property after sunset.
This dedicated hot tub area adds another layer of retreat-style living to the property because the setting out here feels incredibly peaceful and private surrounded by towering trees, territorial views and the quiet natural atmosphere that comes with living atop 20 acres. The concrete pad already includes the necessary hookups for a hot tub setup, and while the current hot tub included with the property needs some repair, it also comes with the cover and convenient access steps that can easily work with a future upgraded unit if desired. The location itself is honestly fantastic because you still capture the same beautiful natural scenery and expansive outlooks found throughout the rest of the property while feeling tucked into your own little forest spa hideaway at the same time. This is exactly the kind of spot that turns into everyone’s favorite place on the property after sunset.
Even on moodier Pacific Northwest days when the clouds decide to drift dramatically across the horizon like they are auditioning for a luxury coffee commercial, the views from this property remain absolutely stunning. Beyond the rolling sea of evergreen treetops sits the legendary Olympic Mountains range, one of the most iconic mountain systems in the Pacific Northwest stretching across nearly a million acres of rugged wilderness, glaciers, alpine lakes and old-growth forest within Olympic National Park. The range spans roughly 70 miles across the Olympic Peninsula and creates the dramatic layered skyline visible from this property, where shifting weather patterns constantly transform the scenery from crystal-clear mountain vistas to soft misty cloudscapes that honestly feel equally beautiful in completely different ways. This is the kind of view that changes hour by hour, season by season, and never really stops being interesting no matter how long you live here.
Even on moodier Pacific Northwest days when the clouds decide to drift dramatically across the horizon like they are auditioning for a luxury coffee commercial, the views from this property remain absolutely stunning. Beyond the rolling sea of evergreen treetops sits the legendary Olympic Mountains range, one of the most iconic mountain systems in the Pacific Northwest stretching across nearly a million acres of rugged wilderness, glaciers, alpine lakes and old-growth forest within Olympic National Park. The range spans roughly 70 miles across the Olympic Peninsula and creates the dramatic layered skyline visible from this property, where shifting weather patterns constantly transform the scenery from crystal-clear mountain vistas to soft misty cloudscapes that honestly feel equally beautiful in completely different ways. This is the kind of view that changes hour by hour, season by season, and never really stops being interesting no matter how long you live here.
Here is the practical side of the primary suite while still keeping all the warmth and character intact. The room feels spacious and grounded with the continued slate flooring, warm tones and pine six-panel doors carrying the mountain-home aesthetic throughout, while thoughtful details add a little extra functionality behind the scenes. One door conceals a substantial wall safe for valuables and important items, which feels extremely on-brand for a property that also includes a reinforced foundation pinned into bedrock and multiple welded safes in the shop because this home clearly likes being prepared for absolutely everything. The gray wall section behind the dresser provides access to another safe and could easily be disguised with artwork depending on furniture placement if desired. Another door leads directly into the en suite bathroom, creating a comfortable private retreat setup that feels tucked away and separate from the rest of the home.
Here is the practical side of the primary suite while still keeping all the warmth and character intact. The room feels spacious and grounded with the continued slate flooring, warm tones and pine six-panel doors carrying the mountain-home aesthetic throughout, while thoughtful details add a little extra functionality behind the scenes. One door conceals a substantial wall safe for valuables and important items, which feels extremely on-brand for a property that also includes a reinforced foundation pinned into bedrock and multiple welded safes in the shop because this home clearly likes being prepared for absolutely everything. The gray wall section behind the dresser provides access to another safe and could easily be disguised with artwork depending on furniture placement if desired. Another door leads directly into the en suite bathroom, creating a comfortable private retreat setup that feels tucked away and separate from the rest of the home.
This en suite bathroom feels like exactly what you would hope to find inside a custom mountain retreat because it balances comfort, warmth and practicality without losing the polished upscale feel running throughout the home. Heated slate flooring continues into the space keeping those rich earthy textures flowing seamlessly from the primary suite, while the oversized heated towel rack adds the kind of everyday luxury that quietly spoils people wonderfully. The long double vanity offers granite counters, warm maple shaker cabinetry, framed mirrors and brushed nickel fixtures that all work together beautifully to create a timeless, grounded aesthetic with just enough lodge-inspired warmth, and over to the right, the huge glass walk-in shower starts making its appearance because apparently this bathroom intends to continue aggressively exceeding expectations. Also, there is also a dedicated toilet room tucked behind a pocket door for added privacy, plus a large walk-in closet.
This en suite bathroom feels like exactly what you would hope to find inside a custom mountain retreat because it balances comfort, warmth and practicality without losing the polished upscale feel running throughout the home. Heated slate flooring continues into the space keeping those rich earthy textures flowing seamlessly from the primary suite, while the oversized heated towel rack adds the kind of everyday luxury that quietly spoils people wonderfully. The long double vanity offers granite counters, warm maple shaker cabinetry, framed mirrors and brushed nickel fixtures that all work together beautifully to create a timeless, grounded aesthetic with just enough lodge-inspired warmth, and over to the right, the huge glass walk-in shower starts making its appearance because apparently this bathroom intends to continue aggressively exceeding expectations. Also, there is also a dedicated toilet room tucked behind a pocket door for added privacy, plus a large walk-in closet.
Now THIS is a shower. The oversized glass walk-in design feels straight out of a luxury mountain lodge spa with enough room for two, dual shower systems and all the little thoughtful details that make the entire experience feel elevated instead of purely functional. Underfoot, the polished river rock flooring adds incredible texture and warmth while still feeling smooth and comfortable, and the tile walls are finished with decorative accent detailing that keeps the entire space visually interesting without becoming busy or trendy. Each shower station includes its own rain-style fixture and body sprays turning regular showers into something significantly more dramatic than they technically need to be, which honestly feels appropriate for this property. Built-in shelving keeps products neatly tucked away, a footrest makes shaving or rinsing easier and the long horizontal privacy window above allows fresh mountain air to flow through the space while still maintaining complete privacy.
Now THIS is a shower. The oversized glass walk-in design feels straight out of a luxury mountain lodge spa with enough room for two, dual shower systems and all the little thoughtful details that make the entire experience feel elevated instead of purely functional. Underfoot, the polished river rock flooring adds incredible texture and warmth while still feeling smooth and comfortable, and the tile walls are finished with decorative accent detailing that keeps the entire space visually interesting without becoming busy or trendy. Each shower station includes its own rain-style fixture and body sprays turning regular showers into something significantly more dramatic than they technically need to be, which honestly feels appropriate for this property. Built-in shelving keeps products neatly tucked away, a footrest makes shaving or rinsing easier and the long horizontal privacy window above allows fresh mountain air to flow through the space while still maintaining complete privacy.
This view captures exactly why the great room feels so memorable the second you walk in because the scale, textures and architectural details all work together without trying too hard to impress you. The dramatic staircase climbs upward beneath soaring vaulted wood-plank ceilings creating this incredible lodge-inspired focal point, while the combination of black iron railing details and rich wood handrails gives the whole space a more elevated custom-home feel compared to traditional all-wood stair systems. Warm cream walls keep the room feeling bright and inviting despite the dramatic ceiling height, and the entire space stays visually connected to the heated slate flooring and mountain views beyond. Underneath the staircase, additional storage is tucked neatly away while the floorplan itself loops naturally through the primary suite hallway and back toward the foyer creating a circular main-floor layout that feels wonderfully fluid and easy for both everyday living and entertaining.
This view captures exactly why the great room feels so memorable the second you walk in because the scale, textures and architectural details all work together without trying too hard to impress you. The dramatic staircase climbs upward beneath soaring vaulted wood-plank ceilings creating this incredible lodge-inspired focal point, while the combination of black iron railing details and rich wood handrails gives the whole space a more elevated custom-home feel compared to traditional all-wood stair systems. Warm cream walls keep the room feeling bright and inviting despite the dramatic ceiling height, and the entire space stays visually connected to the heated slate flooring and mountain views beyond. Underneath the staircase, additional storage is tucked neatly away while the floorplan itself loops naturally through the primary suite hallway and back toward the foyer creating a circular main-floor layout that feels wonderfully fluid and easy for both everyday living and entertaining.
This upstairs bedroom at roughly 12 x 20 feet, is incredibly generous and absolutely drenched in natural light, while the jaw-dropping views looking out across the backyard deck toward the Olympic Mountains and even glimpses of Mount Rainier are amazing! Gorgeous hardwood floors continue throughout the upstairs level adding warmth and richness beneath the vaulted ceilings, while the handsome blue wall color gives the room a calm grounded feel that works beautifully with the natural wood details and surrounding scenery. A second window captures additional territorial views from another direction, the deep closet offers excellent storage behind a pine six-panel door and recessed lighting plus built-in ceiling speakers continue the thoughtful whole-home audio setup carried throughout the property.
This upstairs bedroom at roughly 12 x 20 feet, is incredibly generous and absolutely drenched in natural light, while the jaw-dropping views looking out across the backyard deck toward the Olympic Mountains and even glimpses of Mount Rainier are amazing! Gorgeous hardwood floors continue throughout the upstairs level adding warmth and richness beneath the vaulted ceilings, while the handsome blue wall color gives the room a calm grounded feel that works beautifully with the natural wood details and surrounding scenery. A second window captures additional territorial views from another direction, the deep closet offers excellent storage behind a pine six-panel door and recessed lighting plus built-in ceiling speakers continue the thoughtful whole-home audio setup carried throughout the property.
Upstairs, this vaulted family room creates such a fantastic flexible bonus space and feels wonderfully tucked away from the main living areas while still staying visually connected to the warm mountain-home character throughout the house. At approximately 13.5 x 18 feet, there is plenty of room here for a media lounge, reading retreat, game room, office setup or secondary hangout space depending on how life unfolds, and the vaulted ceilings paired with the gorgeous wood plank ceiling detail keep the room feeling airy and architecturally interesting. Hardwood flooring replaces the slate upstairs adding warmth and softness underfoot while beautifully complementing the rich wood tones overhead, and the thoughtfully placed upper window allows natural light to flood the room without sacrificing furniture placement flexibility. Cozy, functional and full of personality, this room feels like the perfect upper-level escape space.
Upstairs, this vaulted family room creates such a fantastic flexible bonus space and feels wonderfully tucked away from the main living areas while still staying visually connected to the warm mountain-home character throughout the house. At approximately 13.5 x 18 feet, there is plenty of room here for a media lounge, reading retreat, game room, office setup or secondary hangout space depending on how life unfolds, and the vaulted ceilings paired with the gorgeous wood plank ceiling detail keep the room feeling airy and architecturally interesting. Hardwood flooring replaces the slate upstairs adding warmth and softness underfoot while beautifully complementing the rich wood tones overhead, and the thoughtfully placed upper window allows natural light to flood the room without sacrificing furniture placement flexibility. Cozy, functional and full of personality, this room feels like the perfect upper-level escape space.
This upstairs bedroom at roughly 12 x 20 feet, is incredibly generous and absolutely drenched in natural light, while the jaw-dropping views looking out across the backyard deck toward the Olympic Mountains and even glimpses of Mount Rainier from the other bedroom are amazing! Gorgeous hardwood floors continue throughout the upstairs level adding warmth and richness beneath the vaulted ceilings, while the handsome blue wall color gives the room a calm grounded feel that works beautifully with the natural wood details and surrounding scenery. A second window captures additional territorial views from another direction, the deep closet offers excellent storage behind a pine six-panel door and recessed lighting plus built-in ceiling speakers continue the thoughtful whole-home audio setup carried throughout the property. Expanded broadband infrastructure is also expected to continue improving throughout the area moving forward.
This upstairs bedroom at roughly 12 x 20 feet, is incredibly generous and absolutely drenched in natural light, while the jaw-dropping views looking out across the backyard deck toward the Olympic Mountains and even glimpses of Mount Rainier from the other bedroom are amazing! Gorgeous hardwood floors continue throughout the upstairs level adding warmth and richness beneath the vaulted ceilings, while the handsome blue wall color gives the room a calm grounded feel that works beautifully with the natural wood details and surrounding scenery. A second window captures additional territorial views from another direction, the deep closet offers excellent storage behind a pine six-panel door and recessed lighting plus built-in ceiling speakers continue the thoughtful whole-home audio setup carried throughout the property. Expanded broadband infrastructure is also expected to continue improving throughout the area moving forward.
This upstairs bathroom feels bright, cheerful and surprisingly spacious thanks to the vaulted ceiling, soft blue wall color and natural light pouring in from the elevated privacy window above the shower. The full tub/shower combination, tile flooring and undermount sink vanity make the space highly functional for everyday living while still feeling cohesive with the warm custom finishes carried throughout the rest of the home. The elevated window placement is especially smart because it allows sunlight to flood the room while maintaining complete privacy, and the overall atmosphere feels fresh, calming and wonderfully comfortable for guests or upstairs living. It is also worth mentioning that this property includes two massive 3,000-gallon cistern holding tanks supplied from the well below the property, creating substantial water storage capacity that adds another layer of practicality and preparedness to this mountain retreat lifestyle. So yes, absolutely take the extra-long bath.
This upstairs bathroom feels bright, cheerful and surprisingly spacious thanks to the vaulted ceiling, soft blue wall color and natural light pouring in from the elevated privacy window above the shower. The full tub/shower combination, tile flooring and undermount sink vanity make the space highly functional for everyday living while still feeling cohesive with the warm custom finishes carried throughout the rest of the home. The elevated window placement is especially smart because it allows sunlight to flood the room while maintaining complete privacy, and the overall atmosphere feels fresh, calming and wonderfully comfortable for guests or upstairs living. It is also worth mentioning that this property includes two massive 3,000-gallon cistern holding tanks supplied from the well below the property, creating substantial water storage capacity that adds another layer of practicality and preparedness to this mountain retreat lifestyle. So yes, absolutely take the extra-long bath.
This upstairs bedroom mirrors the same generous sizing and peaceful elevated atmosphere found throughout the rest of the upper level while adding another thoughtful feature that makes the space incredibly versatile for modern living. Along with the gorgeous hardwood floors, soft blue wall color and beautiful treetop views pouring through the oversized window, the room also includes a built-in desk alcove perfectly positioned for remote work, studying, gaming setups or creative projects with a spectacular natural backdrop instead of staring at a blank apartment wall while slowly losing the will to answer another email. The room feels bright, calm and wonderfully tucked into the surrounding landscape, and having dedicated desk spaces built into both upstairs bedrooms adds tremendous flexibility depending on how future owners want to utilize the rooms over time. The property currently uses Starlink internet service, which has become a huge asset for more rural and acreage properties.
This upstairs bedroom mirrors the same generous sizing and peaceful elevated atmosphere found throughout the rest of the upper level while adding another thoughtful feature that makes the space incredibly versatile for modern living. Along with the gorgeous hardwood floors, soft blue wall color and beautiful treetop views pouring through the oversized window, the room also includes a built-in desk alcove perfectly positioned for remote work, studying, gaming setups or creative projects with a spectacular natural backdrop instead of staring at a blank apartment wall while slowly losing the will to answer another email. The room feels bright, calm and wonderfully tucked into the surrounding landscape, and having dedicated desk spaces built into both upstairs bedrooms adds tremendous flexibility depending on how future owners want to utilize the rooms over time. The property currently uses Starlink internet service, which has become a huge asset for more rural and acreage properties.
This portion of the shop really highlights how versatile and functional the entire structure is because it is not just oversized parking space, it is a fully usable working environment designed to support serious hobbies, projects and long-term flexibility. The open workspace layout leaves ample room for tools, fabrication areas, storage systems and vehicle access while still keeping the overall space feeling organized and highly usable. Toward the back of the shop you will also find a dedicated reloading room featuring FOUR bolted and welded safes that remain with the property, creating substantial secure storage already built directly into the setup. And because this property apparently refuses to stop overdelivering practical details, there is also a brand-new mini washer and dryer in the shop that has never even been used and will stay with the home, making future apartment use, cleanup or extended shop projects dramatically more convenient.
This portion of the shop really highlights how versatile and functional the entire structure is because it is not just oversized parking space, it is a fully usable working environment designed to support serious hobbies, projects and long-term flexibility. The open workspace layout leaves ample room for tools, fabrication areas, storage systems and vehicle access while still keeping the overall space feeling organized and highly usable. Toward the back of the shop you will also find a dedicated reloading room featuring FOUR bolted and welded safes that remain with the property, creating substantial secure storage already built directly into the setup. And because this property apparently refuses to stop overdelivering practical details, there is also a brand-new mini washer and dryer in the shop that has never even been used and will stay with the home, making future apartment use, cleanup or extended shop projects dramatically more convenient.
This closer look at the unfinished apartment above the shop really highlights how much infrastructure is already in place for future finishing because this is far beyond just “empty bonus space.” The kitchenette area already includes white shaker cabinetry along with the included refrigerator and microwave, while the attached three-quarter bathroom provides a shower, sink and toilet setup that immediately increases the flexibility and usability of the entire upper level. Tucked neatly into the kitchenette area is a dedicated water heater serving the apartment bath, helping keep the systems separated and functional for future guest or extended-use scenarios. And below, inside the massive shop structure itself, you will also find TWO 3,000-gallon cistern holding tanks supplied from the well lower on the property, with the separate pump house operating on its own power service. This property genuinely feels engineered for long-term functionality and self-sufficiency in a way very few do.
This closer look at the unfinished apartment above the shop really highlights how much infrastructure is already in place for future finishing because this is far beyond just “empty bonus space.” The kitchenette area already includes white shaker cabinetry along with the included refrigerator and microwave, while the attached three-quarter bathroom provides a shower, sink and toilet setup that immediately increases the flexibility and usability of the entire upper level. Tucked neatly into the kitchenette area is a dedicated water heater serving the apartment bath, helping keep the systems separated and functional for future guest or extended-use scenarios. And below, inside the massive shop structure itself, you will also find TWO 3,000-gallon cistern holding tanks supplied from the well lower on the property, with the separate pump house operating on its own power service. This property genuinely feels engineered for long-term functionality and self-sufficiency in a way very few do.
Even unfinished, this vaulted bonus room above the shop already has an incredibly fun and functional vibe thanks to the current theater setup complete with SEVEN reclining movie seats, projector and large viewing screen that transform the space into a private entertainment retreat tucked away above the massive shop below. The vaulted ceilings keep the room feeling spacious rather than tucked away, and behind the portable air conditioning unit there is also a window with blinds bringing in natural light and beautiful surrounding territorial views. The portable A/C unit remains with the property and the layout still leaves room for future customization depending on how the next owner wants to evolve the space over time. There is even additional room nearby for a potential future second bathroom addition if desired, making this unfinished bonus area feel loaded w/long-term flexibility whether someone envisions a theater, gaming lounge, office retreat, guest overflow or something different
Even unfinished, this vaulted bonus room above the shop already has an incredibly fun and functional vibe thanks to the current theater setup complete with SEVEN reclining movie seats, projector and large viewing screen that transform the space into a private entertainment retreat tucked away above the massive shop below. The vaulted ceilings keep the room feeling spacious rather than tucked away, and behind the portable air conditioning unit there is also a window with blinds bringing in natural light and beautiful surrounding territorial views. The portable A/C unit remains with the property and the layout still leaves room for future customization depending on how the next owner wants to evolve the space over time. There is even additional room nearby for a potential future second bathroom addition if desired, making this unfinished bonus area feel loaded w/long-term flexibility whether someone envisions a theater, gaming lounge, office retreat, guest overflow or something different
This property keeps proving over and over that it was designed by somebody who truly understood how people actually live, work and play on acreage properties because even the RV setup here is impressively well thought out. Located beside the massive shop is a covered RV carport complete with hookups and water already run directly to the parking area, making it incredibly functional for guests, extended travel setups or full-time RV storage without feeling like an afterthought shoved into a random corner of the property. Right beside the RV space sits a gazebo-style covered deck area creating a surprisingly inviting outdoor hangout zone where you can relax, grill, gather or simply enjoy the peaceful mountain surroundings while staying sheltered from the weather. There is also an RV dump connection conveniently located at the capped pipe beside the deck, while the septic system access lids are tucked discreetly beneath the deck area itself.
This property keeps proving over and over that it was designed by somebody who truly understood how people actually live, work and play on acreage properties because even the RV setup here is impressively well thought out. Located beside the massive shop is a covered RV carport complete with hookups and water already run directly to the parking area, making it incredibly functional for guests, extended travel setups or full-time RV storage without feeling like an afterthought shoved into a random corner of the property. Right beside the RV space sits a gazebo-style covered deck area creating a surprisingly inviting outdoor hangout zone where you can relax, grill, gather or simply enjoy the peaceful mountain surroundings while staying sheltered from the weather. There is also an RV dump connection conveniently located at the capped pipe beside the deck, while the septic system access lids are tucked discreetly beneath the deck area itself.
This laundry room is refreshingly generous in size and wonderfully practical, which feels exactly right for a custom home sitting on 20 acres because tiny cramped laundry spaces simply would not survive this lifestyle. Located conveniently on the main floor between the kitchen and foyer, the room functions beautifully for day-to-day living while still staying tucked out of the main entertaining spaces. At approximately 6.5 by 10 feet, there is ample room for the high-efficiency washer and dryer, folding space, cabinetry storage and a utility sink that becomes endlessly useful for everything from muddy boots to gardening cleanup to handwashing delicate. The window keeps the room bright and welcoming instead of cave-like, while the pocket door helps contain noise and keeps the overall flow of the house feeling clean and uninterrupted.
This laundry room is refreshingly generous in size and wonderfully practical, which feels exactly right for a custom home sitting on 20 acres because tiny cramped laundry spaces simply would not survive this lifestyle. Located conveniently on the main floor between the kitchen and foyer, the room functions beautifully for day-to-day living while still staying tucked out of the main entertaining spaces. At approximately 6.5 by 10 feet, there is ample room for the high-efficiency washer and dryer, folding space, cabinetry storage and a utility sink that becomes endlessly useful for everything from muddy boots to gardening cleanup to handwashing delicate. The window keeps the room bright and welcoming instead of cave-like, while the pocket door helps contain noise and keeps the overall flow of the house feeling clean and uninterrupted.
This amazing floorplan is warm, relaxed and incredibly flexible while also quietly reminding you that this home was built with a level of practicality that a lot of mountain properties simply do not bother with. The mini-split system installed here provides its own dedicated heat and air conditioning for the upper family room, helping keep the vaulted space comfortable year-round, while the home itself also benefits from a full furnace and heat pump setup downstairs for additional efficiency and cooling throughout the rest of the house. Between the multiple systems, heated slate floors and wood stove elsewhere in the home, this property basically refuses to let weather inconvenience anybody. Also the upper level functions as its own secondary living wing with bonus gathering space tucked away from the primary suite and main-floor entertaining areas below.
This amazing floorplan is warm, relaxed and incredibly flexible while also quietly reminding you that this home was built with a level of practicality that a lot of mountain properties simply do not bother with. The mini-split system installed here provides its own dedicated heat and air conditioning for the upper family room, helping keep the vaulted space comfortable year-round, while the home itself also benefits from a full furnace and heat pump setup downstairs for additional efficiency and cooling throughout the rest of the house. Between the multiple systems, heated slate floors and wood stove elsewhere in the home, this property basically refuses to let weather inconvenience anybody. Also the upper level functions as its own secondary living wing with bonus gathering space tucked away from the primary suite and main-floor entertaining areas below.
NWMLS Courtesy of Abbey Realty Inc
90 W Jeanne Saeger Park
Shelton, WA 98584
$1,050,000
Residential
3 Beds
2.50 Baths
2171 SqFt
Active
Share: Share to FacebookShare to TwitterShare to BlueSkyLinked inEmail
Olympic Range & Mt. Rainier views on mountaintop 20-acre retreat where custom home & massive 3000sf 4-bay shop create the ultimate Pacific NW compound. Built directly atop bedrock with reinforced pinned foundation, find fruit trees & blueberry bushes surrounding rugged permanence with chalet-inspired vaulted plank ceilings & rich earthy-tone heated slate floors. Circular floorplan flows past 2-story wall of showcase windows in stacked-stone fireplace living room, dining space with sunroom vibes & beautiful kitchen with warm wood shaker cabinets, white granite, 2 sinks, 2 ovens & peninsula seating. Massive wraparound deck access from living room, dining room, kitchen & main-floor primary suite where stairs lead to hot tub below. Luxe primary bath delivers heated towel rack, granite double vanity, river-rock tile shower with dual fixtures, toilet closet & walk-in closet. Iron & pine staircase leads hardwood floors, mountain view loft & 2 big bedrooms with built-in desks. 12-car mega-shop is truly next-level with 3 auto lifts, unfinished 2-bedroom apartment with mini-splits, theater bonus room with reclining seating & projector, welded safes, new mini washer/dryer & even a propane tank for future Generac setup. Outside find RV hookups/dump, gazebo & adjustable-height carports. Durable metal roofs & fire-resistant HardiePlank siding plus sprinklers & dual 3000-gallon cistern systems create self-sufficient comfort just 10 mins to Shelton shops & eateries or 30 mins to Olympia!
Watch Virtual Tour #1

Property Features

Community: Cloquallum
2 Story
View:
View: Territorial
Cable TV
Deck
Hot Tub/Spa
Outbuildings
RV Parking
Shop
Exterior: Cement/Concrete
Exterior: Wood
Roof: Metal
Parking: Detached Carport
Parking: Driveway
Parking: Detached Garage
Parking: RV Parking
Year Built: 2020
2026 Taxes: $7375.00
Buyer Broker Comp.: 2.5%
Listing #: 2527442

Lot Details

Lot Size: 20.10 acres
Lot Dimensions: irregular
Secluded

Appliances That Stay

Dishwasher
Double Oven
Dryer
Microwave
Refrigerator
Stove(s)/Range(s)
Washer

Interior

Bath Off Primary
Ceiling Fan(s)
Dining Room
Fireplace
Loft
Vaulted Ceiling(s)
Walk-In Closet(s)
Water Heater
Dbl Pane/Storm Window
Cooling: Forced Air, Ductless HP-Mini Split, Heat Pump
Heating: Ductless HP-Mini Split, Heat Pump, Radiant, Forced Air
Electric
See Remarks
Wood
Fireplaces: 1

Schools

District: Shelton
Elem: Bordeaux Elem
Middle: Olympic Mid
High: Shelton High
Call or Email:
Grace Wamwere

What's Near 90 W Jeanne Saeger Park Shelton, WA 98584?

More Homes Near 90 W Jeanne Saeger Park Shelton, WA 98584

Information is based on data available to the associate, including county records. The information has not been verified by the associate and all information presented should be verified by the buyer. Listings are provided by Northwest Multiple Listing Service as distributed by MLS GRID. The associate represented on this web site is not a multiple listing service but is a member of a local MLS.
DMCA Notice
Board of Ethics